13:00:49 #startmeeting monasca 13:00:51 Meeting started Tue Apr 6 13:00:49 2021 UTC and is due to finish in 60 minutes. The chair is chaconpiza. Information about MeetBot at http://wiki.debian.org/MeetBot. 13:00:52 Useful Commands: #action #agreed #help #info #idea #link #topic #startvote. 13:00:55 The meeting name has been set to 'monasca' 13:00:56 Hi 13:01:05 Hi 13:01:16 Hi 13:01:44 Hello Adrian and Matthias 13:01:47 let's start 13:01:55 The agenda as usual https://etherpad.opendev.org/p/monasca-team-meeting-agenda 13:02:45 #topic Add Xena Python-jobtemplates 13:03:21 all changes from this topic are already merged: https://review.opendev.org/q/(projects:openstack/monasca+OR+project:openstack/python-monascaclient)+AND+topic:add-xena-python-jobtemplates 13:04:01 some of them required to be rebased or other changes to be working 13:04:11 no more action is required here. 13:04:28 #topic Create Wallaby Changes 13:05:05 With the exception of the repository monasca-events-api all changes of this topic are merged 13:05:06 https://review.opendev.org/q/(projects:openstack/monasca+OR+project:openstack/python-monascaclient)+AND+topic:create-wallaby 13:06:19 We can talk and decided the future of monasca-events-api in the PTG on Monday April 19 13:07:16 As reported last week, I disabled the docker build and push jobs, because the Wallaby upper-constraints were not yet ready. 13:07:45 Now the Wallaby u-c are ready, then I will enable again the docker Zuul jobs again 13:07:53 https://github.com/openstack/requirements/blob/stable/wallaby/upper-constraints.txt 13:09:29 (As mentioned a week ago, there is a redirection link that works for this week (or two weeks) when the new branch of projects is created but the openstack/requirements new branch is not) 13:09:53 for this release I workarounded by disabling and reenabling the Docker jobs. 13:10:17 that was related to: 13:10:20 #topic Upper-constraints redirection in Docker jobs 13:10:43 Alright, lets go to the fixes done this week: 13:10:52 #topic Fix-log metric configuration 13:11:04 @adriancz, stage is yours 13:12:19 today I created small fix for log-metric 13:13:32 last week in Fujitsu we found problem with log-metrics service 13:13:43 This bug was probably introduced during the upgrade to ELK 7.3.0 13:13:57 yes 13:14:11 adriancz, then we should cherry pick back to the stable branches isn't it? 13:14:36 so after upgrade log-metric service was not able to create metrics from logs 13:15:00 @chaconpiza 13:15:01 yes 13:15:29 Which branches? Ussuri/Victoria? 13:15:44 i need to check that 13:15:51 mmm... Wallaby, Victoria and Ussuri for sure 13:16:00 correct 13:16:07 We need to check for Train, but I think that Train too 13:16:12 Sounds good 13:16:20 let's check when the upgrade to ELK 7.3.0 was done 13:16:47 Al right, thanks for the fix. It is merged on master so far. 13:17:15 let's got to the next topic 13:17:20 #topic Woraround for new PIP 13:18:05 The new versions of PIP are not totally compatible with the way to use it on OpenStack 13:18:33 As you can see in this link https://review.opendev.org/c/openstack/devstack/+/764803 13:18:50 so far it is workarounded in devstack 13:19:33 thanks to this WA all Monasca services in Devstack are working, 13:20:13 but monasca-agent (metric agent) doesn't use the wrapper of Devstack 13:20:25 since it is installed in a Virtual Env. 13:21:31 So I set specific version of PIP for the Virtual Env of where monasca-agent is installed. 13:21:44 It is a WA too, not a real solution. 13:21:59 https://review.opendev.org/c/openstack/monasca-api/+/784094/ 13:22:13 Now Devstack is working ok 13:22:30 #topic Fix warnings in Documentation 13:23:43 I fixed the openstack-tox-docs job of Monasca-api with this change: 13:23:44 https://review.opendev.org/c/openstack/monasca-api/+/784120 13:24:25 The root cause: This change defaults the warning-as-error to True https://review.openstack.org/#/c/559348/ 13:24:46 I took the model of the fix from Keystone btw. 13:25:09 #topic AOB 13:25:55 Don't forget to register in the PTG https://www.openstack.org/ptg/ 13:26:19 I reserved 4 hours for Monday April 19th 13:26:36 No further topic from me 13:27:00 adriancz something else from your side? 13:27:01 Nothing from me 13:27:23 then let's close the meeting. Thank you! See you next week. 13:28:11 Thanks, bye 13:28:17 Thanks 13:28:19 bye 13:28:32 bye 13:28:34 #endmeeting