#openstack-meeting-3: zaqar

Meeting started by flwang at 02:07:51 UTC (full logs).

Meeting summary

    1. https://etherpad.openstack.org/p/zaqar-queens-plan (wxy, 02:18:12)


Meeting ended at 02:45:14 UTC (full logs).

Action items

  1. (none)


People present (lines said)

  1. flwang (33)
  2. wxy (17)
  3. gecong (11)
  4. gengchc (10)
  5. openstack (3)


Generated by MeetBot 0.1.4.