#openstack-meeting-3: zaqar

Meeting started by flwang at 01:00:56 UTC (full logs).

Meeting summary

  1. roll call (flwang, 01:01:04)
    1. https://etherpad.openstack.org/p/zaqar-queens-plan (flwang, 01:05:37)

  2. bugs (flwang, 01:34:37)
  3. open discussion (flwang, 01:37:05)


Meeting ended at 01:56:16 UTC (full logs).

Action items

  1. (none)


People present (lines said)

  1. flwang (83)
  2. gecong_ (37)
  3. wxy_ (27)
  4. gengchc_ (15)
  5. openstack (3)


Generated by MeetBot 0.1.4.