#openstack-powervm: powervm_ci_meeting
Meeting started by esberglu_ at 13:33:11 UTC
(full logs).
Meeting summary
- Status (esberglu_, 13:33:30)
- (esberglu_, 13:46:28)
- Action Items (esberglu_, 13:46:41)
- ACTION: esberglu:
Redeploy with public net fix and removal of pypowervm from
requirements (esberglu_,
13:47:28)
- ACTION: esberglu
figure out where the system for the second staging is (esberglu_,
13:52:51)
Meeting ended at 13:56:49 UTC
(full logs).
Action items
- esberglu: Redeploy with public net fix and removal of pypowervm from requirements
- esberglu figure out where the system for the second staging is
People present (lines said)
- esberglu_ (26)
- thorst_ (21)
- adreznec (11)
- wangqwsh (5)
- openstack (3)
Generated by MeetBot 0.1.4.